Need Quilting Done?
Wednesday, April 3, 2013
Saturday, March 30, 2013
The Very Last Row, Graceful Garden Quilt
Could somebody please come and pull on the quilt
back and strrrrrretch the batting as I quilt this last row? I’m telling you, if
it fits, if I don’t run out of both back and batting, it will be jusssst
baaaarely. . .
If worse comes to worst, I shall remove the quilt from the frame, trim the sides and add onto the bottom, then put the quilt back on the frame and finish quilting. Sounds like a lot of work... but... I’ll do what must be done.
If worse comes to worst, I shall remove the quilt from the frame, trim the sides and add onto the bottom, then put the quilt back on the frame and finish quilting. Sounds like a lot of work... but... I’ll do what must be done.
The 9 hours I worked on the quilt today bring the
total number of hours spent on this quilt to 907. 138 ½ of that is in the
quilting alone.
I wanted to finish tonight, but there are a few hours of work left, and I don't want to fall asleep tomorrow in the middle of Easter church services. The ushers with the goads might get me!
(I said that once to an elderly aunt of Larry's, and ... she thought I meant it.)
I wanted to finish tonight, but there are a few hours of work left, and I don't want to fall asleep tomorrow in the middle of Easter church services. The ushers with the goads might get me!
(I said that once to an elderly aunt of Larry's, and ... she thought I meant it.)
Here are just a couple of the blocks done today; the
previous row is already rolled up on the take-up bar.
Thursday, March 28, 2013
Quilting Again -- Graceful Garden Quilt
I’m back in
business! Quilting business, that is.
Kevin, the HQ tech from Country Traditions in
Fremont, brought my machine back Wednesday morning a little after 10:00
a.m. He set up the machine. . . started quilting with it. . . it was
working fine. . . then I told him exactly what I was doing when I had troubles
with skipping stitches, so he did just what I had been doing – and sho’ ’nuff,
it skipped. He called a tech in Salt Lake City. . . had a little
discussion. . .checked a few settings – and suddenly noticed a gap in the
bobbin assembly where a gap shouldn’t be. He investigated. . . and then
came to the same conclusion Larry had come to when I first started having
troubles: the bobbin assembly needed to be replaced.
He replaced it. . . worked for a bit to get
tension top and bottom just right. . . I tried it out. . .
perfect. It sews perfectly.
Smoother and nicer than it has ever sewn since I got it.
So, for a measly (?!) little (?!) $300 (!!!),
I’m back in business. $217 for the bobbin assembly; the rest for labor
and gas. Kevin had given it a thorough take-apart and once-over while it
was in his store, oiling and tightening and servicing everything. And
boy, oh, boy, can I ever tell it. Everything is smoother – motor,
movement, needle bar, everything. While the machine was down for the
count, I got all the coordinating pillows done, and all our Easter sewing
besides. I am ready to quilt!! I quilted for six hours yesterday
and eight hours today, giving it a thorough workout with echo stitching,
free-motion quilting, laser-light following pantograph, and ruler work.
Not one skipped stitch. Not one. Not one! And the tension is perfect, too, top and
bottom. I’m so happy!
Saturday, March 23, 2013
Doorknob Pillow for Graceful Garden Quilt Ensemble
Yep, I'm still making pillows, because my HQ16 is
still refusing to quilt without skipping stitches. Larry has taken it
back to the dealership in Fremont so the tech can work on it.
This little 6" x 6" doorknob pillow will
be the very last coordinating pillow. The pieced heart was paper-pieced
-- first time I ever did paper-piecing. The Prairie Points were left over
from the Whirligig Pillow.
After taking pictures of this side of the pillow, I decided it was too plain to suit me, so I added a few short strands of beads.
Subscribe to:
Posts (Atom)




















































