Need Quilting Done?
Friday, March 15, 2013
Saturday, March 9, 2013
Thursday, March 7, 2013
The Quilting Continues, Graceful Garden Quilt
Comparing my pictures of the quilt on my bed to the
part of the quilt that is showing in my frame, I do believe I have hit the
halfway mark!
The colors of the photos weren't exactly right,
because I angled my flash upwards in order that the quilting would better
show. I fixed the colors the best I could in my photo editor; they're
pretty close now, but not nearly as vibrant as they are in real life.
Real quilt. Real. . . something-or-other.
Tuesday, March 5, 2013
Over a Third of the Graceful Garden Quilt Top is Quilted
Since Saturday, I've had a bit of trouble with my
machine skipping stitches. I tried all the usual remedies to no avail
(new needle, rethread, clean, oil, check tension, loosen quilt, etc.).
Larry took apart the bobbin assembly, thoroughly cleaned and oiled it, put it
back together, and reset the timing.
That helped, but hasn't entirely eliminated the
problem. I can usually avoid the issue until I'm using a ruler and moving
the machine in a northwesterly direction (away from me and to the left).
Yesterday I ordered some special needles from Mike
Gilomen, owner of The Machine Shop in Highland, Illinois. These are
supposed to reduce skipped stitches. Mike sent me one of those needles
last year, gratis, and it did help.
I just checked the USPS Track & Confirm page,
and I see that the needles made it to the Hazelwood, Missouri, USPS Sort
Facility at 10:25 p.m. this evening. Scheduled arrival: March 8,
2013. March 8?! That's three more days! I could drive there in 7 hours and 20
minutes! Bah, humbug.
Well, in the meanwhile, I shall limp along the best
I can.
Doesn't look too
bad, I guess.
Subscribe to:
Posts (Atom)