Tuesday, March 5, 2013

Over a Third of the Graceful Garden Quilt Top is Quilted



Since Saturday, I've had a bit of trouble with my machine skipping stitches.  I tried all the usual remedies to no avail (new needle, rethread, clean, oil, check tension, loosen quilt, etc.).  Larry took apart the bobbin assembly, thoroughly cleaned and oiled it, put it back together, and reset the timing. 

That helped, but hasn't entirely eliminated the problem.  I can usually avoid the issue until I'm using a ruler and moving the machine in a northwesterly direction (away from me and to the left).

Yesterday I ordered some special needles from Mike Gilomen, owner of The Machine Shop in Highland, Illinois.  These are supposed to reduce skipped stitches.  Mike sent me one of those needles last year, gratis, and it did help. 

I just checked the USPS Track & Confirm page, and I see that the needles made it to the Hazelwood, Missouri, USPS Sort Facility at 10:25 p.m. this evening.  Scheduled arrival:  March 8, 2013.  March 8?!  That's three more days!  I could drive there in 7 hours and 20 minutes!  Bah, humbug.

Well, in the meanwhile, I shall limp along the best I can. 

Doesn't look too bad, I guess.

































Friday, March 1, 2013

Three More Pillows for Graceful Garden Ensemble



My HQ16 started skipping stitches last night, so today I sewed pillows until Larry had time to fix my machine.  He took the bobbin assembly completely apart, thoroughly cleaned it, oiled it, and put it back together.  Then he reset the timing... I gave it a try-out... and it woiks, it woiks, it woiks!  The last two pillows can wait; I shall quilt! 

Here are the pillows; I finished the third one just before midnight.

Dahlia pillow


Garden Maze pillow



Magnolia Branch pillow




Magnolia Branch pillow trim


Thursday, February 21, 2013

More Quilting, Graceful Garden Quilt



Another row done... and the last time I rolled the quilt forward, the inner border made of one-inch squares made its appearance!