Thursday, September 16, 2010

Saturday, September 11, 2010

Thimbleberries Pillows #3 and #4




Hmmm... This needs something.

There!  That's better.

Metallic bronze topstitching



Pillow back -- using up some of the scraps



Friday, September 10, 2010

Thimbleberries Village Quilt Back and Pillow #1

The wind is swooping up under the deck, so I can't get the ripples smoothed out.

First pillow is done.






Saturday, September 4, 2010

Thimbleberries Village Quilt Top Completed

It's done, it's done!  The entire quilt top is finished.  Victoria is helping me spread the quilt on the deck.








Friday, September 3, 2010

Thimbleberries Village Quilt Hang Done

Bottom left

Foot middle

Bottom right

And now it really doesn't fit on my design wall.  :-D